Below is a list of our recent projects, listed by date.
| PROJECT |
CLIENT |
IMAGES |
| Australian Cement Expansion Fabrication and Construction |
Steel Fabrication Australia - Construction Australia |
|
|
| Manufacture of concrete moulds and precast |
Procast |
|
|
| Ok Tedi Mine Expansion Fabrication and Construction |
Steel Fabrication China - Construction PNG |
|
|
| Detail Design fabrication construction of spoil conveyors for the North South bypass tunnel. |
H+E Ligistik GmbH |
|
|
| Abbott Point Coal Terminal Stage 2 Fabrication and Construction |
Steel Fabrication Australia - Construction Australia |
|
|
| The fabrication and construction of an overpass for the Redcliffe High School |
Main Roads Queensland |
|
|
| Fabrication and construction of 20 metre diameter 30 metre high spoil silos |
Leightons |
|
|
| Construction of new clinker shed including Civil Concrete Structural Mechanical and electrical works |
Sun State Cement |
|
|
| Waste Tailings Project Installation of tanks buildings equipment and piping systems. |
Oktedi Mining |
|
|
| Lihir Gold Expansion |
Steel Fabrication Australia - Construction PNG |
|
|
| Rotating frames for Lake Lindsay Dragline - Centre / 1st Left & Right / 2nd Left & right. |
Bucyrus AUSTRALIA |
|
|
| Supply & Fab: Cable Gantry to Captain Cook Bridge |
ENERGEX Limited |
|
|
| Supply fabricate install and Commission coal conveyors |
Connell Wagner Pty Ltd |
|
|
| Lihir Floatation Upgrade |
LIHIR MANAGEMENT COMPANY LTD |
|
|
| Supply and Installation of Deminerilisation plant ant Tenyson Power Station |
Queensland Electricity Commission |
|
|
| Upgrade of pumps at Mt Crosby Water treatment plant |
DEPARTMENT OF PUBLIC WORKS |
|
|
| Supply of Pre fabricated Steel to Yabulu Area 370 |
Hatch |
|
|
| Porte Cochere Prototype for Q1 retail area |
Sunland Constructions |
|
|
| Mechanical Upgrade and piping installation for Lihir Island No 2 Grinding Thickener Project |
LIHIR MANAGEMENT COMPANY LTD |
|
|
| Upgrade of Oakey Abattoirs |
Oakey Abattoirs |
|
|
| On going Manufacture of Rail Wagons. |
Queensland Rail |
|
|
| Ash Hoppers & Structural Steel for Callide |
SHAW AITON |
|
|
| Structural for Curragh |
SEDGMAN PTY LTD |
|
|
| Top Girders for Kogan Creek Boiler House. |
HITACHI |
|
|
| Principal Contractor Noise Barriers for Sims Metal. |
Sims Metals |
|
|
| Relocatable Jig Plant Supply and Install |
ROCHE MINING (MT) |
|
|
| Supply and Install a 38 metre Thickener and associated Process tanks and piping into Lihir Island PNG. |
LIHIR MANAGEMENT COMPANY LTD |
|
|
| Upgrade of floatation cells for Tritton Copper |
Ausenco |
|
|
| Principal Contractor for the Detail manufacture and construct 36 metre diameter thickener and upgrade existing floating concentrator . |
Sinclair Knight Merz |
|
|
| Demolition Manufacture Design and construct new roof for Lang Park football stadium using state of the Art Construction techniques. |
Nixenco |
|
|
| Principal Contractor for the Design and construct of 3 16 metre high tanks with associated Access and process piping for QAL Gladstone. |
Hatch |
|
|
| Fabrication of Stack at Swanbank Power Station |
STORK ICM AUSTRALIA PTY LTD |
|
|
| Supply and Installation of Turbine Structure and equipment platforms |
Alstom Power Boiler Devision |
|
|
| Principal Contractor for the Design supply & installation of steelwork and mechanical components for coal sizing and handling plant for Jellinbah Plains project |
Oldenburg Australasia Pty. Ltd |
|
|
| Principal Contactor for the Supply & Construction of Coal Transfer Station |
Tarong Energy |
|
|
| Millmeran Power Station Manufacture off site assembly painting and delivery of boiler house components |
Haven Steel |
|
|
| Principal Contractor for the Detailing fabrication and construction of conveyor support steel platforms control room and the installation and commissioning of conveyors and equipment. |
AP Morling |
|
|
| Detailing manufacture painting off site fit out and delivery of a coal handling system for the Millmeran power station. Included the dump station overland conveyor stockpile feed and reclaim conveyors crushing building transfer conveyors trippers |
FMC |
|
|
| Principal Contractor for the Design and construction of 3 500 m2 warehouse including all civil and construction works. |
SEALY OF AUSTRALIA |
|
|
| Installation of processing plant such as cookers mixers screw conveyors boilers bins and the fabrication and installation of steam and process piping in both carbon and stainless steel |
AJ Bush |
|
|
| Design and construction of animal by product handling plant including belt conveyors screw conveyors live bottom bins and pneumatic indexing systems. |
DAVIS GELATINE |
|
|
| Design and construction of prototype plant and relocation of fabric filter plant to Swanbank 'A' power station. |
CS Energy |
|
|
| Fabrication of conveyors and structural steelwork for Mt Leyshon Gold Mine Charters Towers. |
THIESS PTY LTD |
|
|
| Principal Contractor for the Turnkey construction of rail workshops at Redbank Queensland |
Queensland Rail |
|
|
| Fabrication and construction of a 120 mtr high x 4.5 mtr diameter steel tower for a thrill ride called the Tower of Terror at Dreamworld on the Gold Coast. |
Dreamworld |
|
|
| Principal Contractor for the Supply and construction of microcell units filter press conveyor including coal washery modifications piping plate work and structural steelwork |
Bulk Material Coal Handling |
|
|
| Principal Contractor for the Construction of a Kaolin plant including the supply of structure vessels piping ducting and equipment |
Australian Kaolin |
|
|
| Principal Contractor for the Relocation and upgrade of mine process facility and dredge. Including the supply of fabricated components. |
Consolidated Rutile |
|
|
| Fabrication and construction of 3 200 tone of structural steelwork for the Callide B turbine house structure at the Callide power station in central Queensland. |
CS Energy |
|
|
| Principal Contractor Fabrication and Construction of a 1000T Capacity Oil Storage Tank Fabrication and Installation of Stainless Steel Heat Exchanger and Pipe work. Manufacture and installation of drag chain conveyors. |
Queensland Oil Seed Crushing |
|
|
| Fabrication of construction of coal washing sumps launders and processing equipment for the Gordonstone coal mine. |
BHP BILLITON |
|
|
| Fabrication of chutes tanks and hoppers for the Gordonstone coal washing plant. |
HITACHI |
|
|
| Fabrication and delivery of 800t of air ducting for the Stanwell power station in central QLD. |
Clyde Babcock Hitachi |
|
|
| Fabrication and construction including all civil and concrete works for the primary pipe-racks and pipe bridges at Oricas Ammonium Nitrate plant in Gladstone. |
Orica |
|
|
| Fabricate and construct the ammonium nitrate complex at Gladstone |
Orica |
|
|
| Fabricate main girders for Stanwell power station. |
Clyde Babcock Hitachi |
|
|
| Fabricate coal feed and crusher station conveyors for North Goonyella coal mine. |
HUWOOD INTERNATIONAL |
|
|
| Fabrication of conveyor galleries for the Clinton coal stockpiling and ship loading expansion. |
GLADSTONE PORT AUTHORITY |
|
|